In Saudi Aramco contracts, Schedule G traditionally covers the Health, Safety, and Environmental (HSE)

Use this if your report is about upgrading a facility (like a rig) to meet Saudi Aramco's "Schedule G" standards [1, 2]. Drafting Structure: Project Scope: Detail the specific upgrades (e.g., helideck modifications

Report on the total man-hours worked without Lost Time Injuries (LTI) [2]. Documentation (NMR): Reference the Non-Material Requirements (NMR) submitted, such as (General Arrangement Drawings) or (Certified construction drawings) [11, 14]. Material Sourcing: 9COM or 9CAT materials used that required specific buyer approval [13]. Tips for a Professional Report Be Precise: saudi aramco schedule g

Steps to rectify any non-compliance identified during inspections. Option 2: Technical/Refurbishment Progress Report

Use this if you are reporting on a project's adherence to safety protocols as defined by Saudi Aramco's Health, Safety, and Environmental Requirements Manual Focus Areas Executive Summary In Saudi Aramco contracts, Schedule G traditionally covers

provided by the company and the contractor's responsibilities for managing them safely [7].

requirements that a contractor must follow [5, 7]. Specifically, it often outlines the materials, tools, and equipment Material Sourcing: 9COM or 9CAT materials used that

If referencing specific manuals, use the document number (e.g., SA-DWO-HSERM-002-R0 ) to show technical accuracy [5]. Focus on Responsibility: Explicitly state which materials were Company Provided